Interior & exterior painting · Greater Boston
- Walk the rooms00
- Colour and sheen01
- Protect and repair02
- Prime03
- Two finish coats04
- Reinstall, clean, walk05
The prep is the job.The paint is the easy part.
Patch, sand, caulk, prime, mask — then two coats of a premium finish. Interior and exterior, on New England houses that move with the seasons and show every shortcut on the trim.
- Estimate
- Colour consult included
- Written price
- Site left clean daily
- Track record
- 21 years in business
- Based in
- Maynard, MA · Greater Boston
- Protection and masking
- Wash and de-gloss
- Patch and skim
- Caulk and seal
- Spot and full prime
- Finish coats
- Daily clean-down
- Walk-through under real light
The argument
Apaintjobfailsatthecaulklineandthebarespotbehindtheradiator—neverinthemiddleofthewall.
Where the hours go
What happens before the first coat
Most of a painting estimate is prep hours. Here is exactly what those hours buy, so you can compare our number to anyone else's honestly.
Sheet
Scope of work
08 items · rev. 2026
Protection and masking
Floors covered, furniture moved to the middle and wrapped, fixtures and hardware removed rather than taped around, and hard lines masked at every edge.
Wash and de-gloss
Kitchen and bath walls get degreased, exteriors get washed. Paint doesn't bond to grease, chalk or mildew, and it will tell you so within a year.
Patch and skim
Nail pops reset, cracks cut out and taped rather than smeared, dents filled, then sanded flat and dusted before priming.
Caulk and seal
Trim-to-wall, casing joints and exterior seams caulked with a paintable sealant. This is the single line most crews skip and the first one that opens.
Spot and full prime
Bare wood, patched compound, stains and any big colour change get the right primer for the substrate — not a coat of finish paint pretending to be one.
Finish coats
Two coats of a premium interior or exterior finish, cut in by hand at every edge, in the sheen that suits the room rather than the sheen that hides the least.
Daily clean-down
Tools out of the space, drop cloths folded, floors vacuumed. We leave the house liveable at the end of every working day, not just at the end of the job.
Walk-through under real light
We walk the rooms with you at daylight and again with the lights on, mark the touch-ups, and do them before invoicing.
Interior vs exterior
New England decides when the outside gets painted.
Interiors run year-round. We work one area at a time in an occupied house, protect the route in and out, and clean the space down at the end of every working day.
Exteriors are different. Paint needs a dry surface and a warm enough one to cure, and in Massachusetts that means the warm, dry stretch of the year — not whichever week is convenient. Coating a damp or cold surface to hit a date buys you a peel in eighteen months.
We will tell you that at the estimate rather than after the fact, and we'd rather move an exterior a week than hand you a job that fails.
- Interior, year-round
- One room at a time, house stays liveable, site cleaned daily.
- Exterior, weather-bound
- Scheduled around surface temperature and moisture, not around the calendar.
- Colour tested in your light
- Sampled on your wall and checked morning and evening before a gallon is bought.
Why 7 Days
The details you notice from three feet away.
Hardware off, not taped over
Switch plates, hinges and hardware come off. It takes longer and it's the difference you notice from three feet away for the next decade.
Colour tested on your wall
We sample in the actual room and look at it morning and evening. North-facing rooms in New England make warm colours go grey.
Cleaner than we found it
Twenty-one years of working in occupied houses. The site gets cleaned down every day, not once at the end.
The sequence
How a painting job runs
Short and predictable — as long as nobody skips a step.
Exterior work in Massachusetts is weather-bound. We schedule exteriors for the warm, dry stretch of the year and we won't put a coat on a wet or cold surface to hit a date — it will peel, and then it's both our problems.
- 00
Walk the rooms
Free on-site estimate, Monday to Saturday, 3 to 5 PM. We count the rooms, the trim, the ceilings and the repairs, then write it down.
- 01
Colour and sheen
Colour consult included. We sample on your wall, in your light, because a chip under a store fluorescent lies.
- 02
Protect and repair
Cover, move, mask, wash, patch, sand, caulk. Usually the longest phase, and the one worth paying for.
- 03
Prime
The right primer for the surface — bare wood, fresh compound, stains, tannin-prone trim, or a dark-to-light colour change.
- 04
Two finish coats
Cut in by hand, rolled or sprayed depending on the surface, with proper dry time between coats instead of a rushed recoat.
- 05
Reinstall, clean, walk
Hardware and fixtures back on, furniture back in place, site cleaned, punch list closed with you in the room.
The work
Finishes we deliver.
Walls, ceilings, trim and cabinetry — interior and exterior, on houses that are lived in while we work.
Reference builds in the configurations and materials we work in. Photography of 7 Days projects is added here as jobs are completed and released by the homeowner.
What clients say
Verified reviews,on Angi.
Verified reviews from the 7 Days profile on Angi. They cover a range of trades — every one of them is published there under the client's own name.
4.8
4 reviews
on Angi
“I hired 7 Days Remodel & Contracting to replace my deck and repair the front porch. I also needed new kitchen and bathroom flooring and tile on the kitchen counter and upstairs bathroom. Al and his team were extremely professional and multitasked to complete interior and exterior while I was away on military orders. Pleasantly surprised and extremely satisfied with the outcome and highly recommend them — Al communicated consistently throughout the process and completed the work as discussed prior to my return and on budget.”
“Al did a great job on our renovation of our three-unit apartment building. He showed up, his team showed up, and everyone was skilled, delivering a great result.”
R.S.S.
Angi · Oct 7, 2025
“They start and finish the work and I'm happy.”
Jim B.
Angi · Sep 12, 2025
“The job was done in a timeframe that was shorter than projected. Their team was very professional and did a great job cleaning up behind themselves.”
Gregory H.
Angi · Aug 16, 2025
Genuine, verified customer reviews from the 7 Days profile on Angi. Names are shown exactly as Angi publishes them.
Straight answers
What people ask about painting.
How long does painting an interior take?
A few rooms is usually two to four working days including prep. A whole floor or a whole house is a week or more. Prep is what moves the number, and we itemize it so you can see where the hours go.
Do I need to move out?
No. We work in occupied houses constantly. We do one area at a time, protect the route in and out, and clean the space down at the end of each day.
Do you supply the paint?
Yes, and we'll tell you which line we're using and why. If you'd rather buy the paint yourself, that's fine too — we'll spec exactly what to get.
When can you paint the exterior?
Exterior painting in Massachusetts runs in the warm, dry part of the year. Surface temperature and moisture decide the schedule, not the calendar — we won't coat a cold or damp surface just to hit a date.
My house was built before 1978. What about lead paint?
We don't do de-leading — that requires a licensed deleader. If we suspect lead on a surface we'd be disturbing, we stop and tell you before we sand anything.
Can you paint kitchen cabinets?
Yes, and it lives or dies on prep: doors off and labelled, hardware removed, degreased, sanded, bonding primer, then finish. Ask about it at the estimate so we can look at the doors first.
Beyond the bathroom
Other trades, same shop
Each of these runs with its own partner and its own crew.
- 01
Bathroom Remodeling
Most bathroom jobs go wrong in the two days nobody photographs: the rough plumbing and the waterproofing. That's where we spend our attention.
- 02
Kitchen Remodeling
Kitchens don't stall because of the carpentry. They stall because someone demoed in March and the cabinets shipped in June.
- 03
Home Remodeling
The reason crews walk off a remodel is that they promised a date they never had. We only commit to schedules we can hold.
Free on-site estimate
Book a free painting estimate
We walk the rooms with you, count the real prep, and put a written itemized price in your hands within 48 hours.
- Estimate window
- Mon–Sat · 3:00 PM – 5:00 PM
- On site
- About 30 minutes
- Written price
- Within 48 hours
