Bathroom remodeling · Greater Boston
- Estimate on site00
- Protection and demo01
- Rough plumbing and electrical02
- Waterproofing03
- Tile and grout04
- Vanity, fixtures and trim05
- Walk-through and sign-off06
One bathroom. One crew.Finished on the date we gave you.
We tear out, re-plumb, waterproof, tile and finish your bathroom with our own people — from a 5×8 hall bath in a Waltham two-family to a primary suite in Wellesley. You get a written scope and a finish date before anything gets demolished.
- Estimate
- Free on-site estimate
- Written price
- Written price in 48 hours
- Track record
- 21 years in business
- Based in
- Maynard, MA · Greater Boston
- Protection & dust control
- Full tear-out to the studs
- Rough plumbing
- Electrical & ventilation
- Waterproofing & flood test
- Tile, niche & grout
- Vanity, toilet & fixtures
- Glass, punch list & walk-through
The argument
Mostbathroomjobsgowronginthetwodaysnobodyphotographs:theroughplumbingandthewaterproofing.That'swherewespendourattention.
Scope of work
What a 7 Days bathroom actually includes
This is the scope sheet we hand you at the estimate — the same list, in the same order, that the crew works from. Nothing on it is a line item we add later.
Sheet
Scope of work
08 items · rev. 2026
Protection & dust control
Floor and stair protection from the door to the bathroom, a zippered dust wall at the opening, and debris carried out the same day it comes off the wall.
Full tear-out to the studs
Tile, board, tub, vanity, toilet and the old subfloor if it's soft. We look at the joists and the supply lines while the walls are open and tell you what we find.
Rough plumbing
Drain and supply relocated for the new layout, shower valve set to the tile plane, shutoffs replaced, and the whole thing pressure-checked before anything closes up.
Electrical & ventilation
GFCI outlets, vanity and shower lighting, and an exhaust fan ducted to the outside — not into the joist bay or the attic, which is how ceilings grow mold.
Waterproofing & flood test
Sloped mortar bed, bonded waterproofing membrane at the pan, curb and wall, corners banded, and a 24-hour flood test on the pan before a single tile goes down.
Tile, niche & grout
Layout dry-run so cuts land where you'd want them, recessed niche framed and pitched, then grout and a sealed perimeter in silicone — never grout — at every change of plane.
Vanity, toilet & fixtures
Vanity set and scribed to the wall, top and bowl, trim kits, toilet on a new flange and wax, mirror, lights and hardware.
Glass, punch list & walk-through
Shower glass measured on site, then installed when the fabricator delivers. We walk the room with you and fix the punch list before the final invoice.
The sequence
Seven working days, in order
A bathroom is a real sequence — nothing in it can be done out of order, which is exactly why a crew that leaves mid-job costs you weeks. Here is how ours runs.
Shower glass is templated on site and installed as soon as the fabricator delivers, which is usually the week after the tile is grouted. We tell you that up front rather than at the end.
- 00
Estimate on site
Thirty minutes in your bathroom, Monday to Saturday between 3 and 5 PM. You get a written, itemized proposal within 48 hours — not a number over the phone.
- 01
Protection and demo
Dust wall up, room stripped to the studs, debris out the same day. This is also when surprises surface, and when we tell you about them.
- 02
Rough plumbing and electrical
New drain and supply, valve set, GFCI and lighting, fan ducted outside. Permits pulled with your town and inspections scheduled by us.
- 03
Waterproofing
Mortar bed, membrane, banded corners, flood test. This is the day that decides whether the ceiling below stays dry for twenty years.
- 04
Tile and grout
Dry layout first so the cuts are deliberate. Then wall, floor, niche, grout, and silicone at every corner and change of plane.
- 05
Vanity, fixtures and trim
Everything you actually touch goes in: vanity, top, faucet, toilet, mirror, lighting, hardware, door and trim.
- 06
Walk-through and sign-off
We walk the room with you, write the punch list, finish it, and clean the space before we invoice.
The day that matters
Waterproofing is the whole job.
A shower is a box that holds water for twenty years. Tile does not do that — tile is the finish. What keeps water out of your joists is a sloped mortar bed, a bonded membrane carried up the walls and over the curb, and banded corners at every change of plane.
We flood-test the pan for a full 24 hours before a single tile goes down. If it holds, we tile. If it doesn't, we find out on our time instead of on your ceiling.
It is the least photogenic day of the job and the only one that decides whether you call anybody about this bathroom again.
- Sloped mortar bed
- Pitched to the drain before anything waterproof goes on.
- Bonded membrane
- Pan, curb and walls, with corners banded rather than caulked.
- 24-hour flood test
- Plugged, filled, marked and checked the next day.
- Silicone, not grout
- Every inside corner and change of plane stays flexible so it doesn't crack open in year two.
Why 7 Days
Four things that decide how a bathroom job goes.
Our crew, not a subcontractor lottery
The same certified people who demo your bathroom are the ones who tile it. You are not waiting on a tile guy who answers to somebody else's schedule.
We start and we finish
Twenty-one years and the promise hasn't changed: no abandoned jobs. We only commit to dates we can hold, then we hold them.
One bathroom, one household
If it's your only full bath, we plan the sequence around that — the toilet goes back in as early as the work allows, and we tell you which nights are the hard ones.
You see it every day
Photos and progress every working day, so the first time you see the tile layout isn't the day it's permanent.
The work
Bathrooms we build.
Walk-in showers, tub-to-shower conversions, primary suites and small second-floor baths — the range we work in across Greater Boston.
Reference builds in the configurations and materials we work in. Photography of 7 Days projects is added here as jobs are completed and released by the homeowner.
What clients say
Verified reviews,on Angi.
Verified reviews from the 7 Days profile on Angi, including the bathroom tile and flooring work.
4.8
4 reviews
on Angi
“I hired 7 Days Remodel & Contracting to replace my deck and repair the front porch. I also needed new kitchen and bathroom flooring and tile on the kitchen counter and upstairs bathroom. Al and his team were extremely professional and multitasked to complete interior and exterior while I was away on military orders. Pleasantly surprised and extremely satisfied with the outcome and highly recommend them — Al communicated consistently throughout the process and completed the work as discussed prior to my return and on budget.”
“Al did a great job on our renovation of our three-unit apartment building. He showed up, his team showed up, and everyone was skilled, delivering a great result.”
R.S.S.
Angi · Oct 7, 2025
“They start and finish the work and I'm happy.”
Jim B.
Angi · Sep 12, 2025
“The job was done in a timeframe that was shorter than projected. Their team was very professional and did a great job cleaning up behind themselves.”
Gregory H.
Angi · Aug 16, 2025
Genuine, verified customer reviews from the 7 Days profile on Angi. Names are shown exactly as Angi publishes them.
Service area
Bathroom remodeling, town by town.
Nine towns, nine different sets of problems behind the plaster. Each page is written for the housing stock in that town.
- 01Maynard, MA7 Days is based in Maynard. Your bathroom is the shortest drive on our schedule.
- 02Waltham, MATwo-families, triple-deckers and 1920s colonials — where a bathroom sits over somebody's ceiling.
- 03Newton, MAVictorians, shingle-style and centre-entrance colonials, where the primary bath has to be carved out of what's there.
- 04Watertown, MABungalows, two-families and 1950s ranches with original mud-set tile that has held on for seventy years.
- 05Belmont, MAColonials, capes and Dutch colonials from the 1920s to the 1950s, usually with one hall bath doing all the work.
- 06Chestnut Hill, MAPrimary suites at spa scale — slab, glass and heated floors, with lead times that decide the calendar.
- 07Cambridge, MATriple-deckers, Victorian two-families and condos, where the building has as many rules as the town does.
- 08Brookline, MA1920s brick apartment buildings, condos and large Victorians — stacked living, shared plumbing, zero margin on waterproofing.
- 09Wellesley, MAColonials and capes with primary suites — double vanity, soaking tub, glass shower, and a finish date that holds.
Straight answers
What people ask before they book.
How long does a bathroom remodel take?
A standard full bath runs about seven working days on site, plus the shower glass, which is templated after the tile is grouted and installed when the fabricator delivers. Layout changes, custom tile patterns and long-lead vanities push that out — and we put the real number in your written proposal instead of the optimistic one.
Can we still use the bathroom while you work?
Not the one we're building. If it's your only full bath, tell us at the estimate — we sequence the toilet back in as early as the work allows and we'll tell you honestly which nights you'll want a plan B.
Do you pull the permits?
Yes. Plumbing and electrical permits are pulled with your town's building department and we schedule the inspections. You don't chase paperwork.
What does a bathroom remodel cost?
It depends on the size of the room, whether the layout moves, and what you pick for tile, vanity, fixtures and glass. We don't quote bathrooms over the phone. The on-site estimate is free, takes about thirty minutes, and produces a written itemized price within 48 hours.
Can you convert a tub into a walk-in shower?
Yes, and it's one of the most common jobs we do in older Greater Boston homes. It usually means a new pan and drain location, a proper sloped mortar bed and membrane, and a decision about whether to keep a curb or go curbless — which depends on your joists. We look at that at the estimate.
Do you do small bathrooms and powder rooms?
Yes. A 5×7 second-floor bath in a 1920s two-family is our bread and butter, and a powder room is a short job we're happy to schedule.
What about asbestos or lead paint?
We don't do asbestos abatement or de-leading — those need a licensed specialist and we'll refer you to one. If we find something behind the wall during demo, we stop, tell you, and don't disturb it.
Who is actually in my house?
Our own vetted, certified crew. Same faces from demo day to the final walk-through, and you have Alessandro's number the entire time.
Beyond the bathroom
We also do
Bathrooms are what we lead with. These trades run out of the same shop, on the same schedule, with a partner accountable for each one.
- 01
Kitchen Remodeling
Kitchens don't stall because of the carpentry. They stall because someone demoed in March and the cabinets shipped in June.
- 02
Interior & Exterior Painting
A paint job fails at the caulk line and the bare spot behind the radiator — never in the middle of the wall.
- 03
Home Remodeling
The reason crews walk off a remodel is that they promised a date they never had. We only commit to schedules we can hold.
Free on-site estimate
Book the free on-site estimate
Thirty minutes in your bathroom, Monday to Saturday between 3 and 5 PM. Written itemized proposal within 48 hours. No pressure, no phone quotes.
- Estimate window
- Mon–Sat · 3:00 PM – 5:00 PM
- On site
- About 30 minutes
- Written price
- Within 48 hours
