Bathroom remodeling · Greater Boston

One bathroom. One crew.Finished on the date we gave you.

We tear out, re-plumb, waterproof, tile and finish your bathroom with our own people — from a 5×8 hall bath in a Waltham two-family to a primary suite in Wellesley. You get a written scope and a finish date before anything gets demolished.

(508) 734-4894
Estimate
Free on-site estimate
Written price
Written price in 48 hours
Track record
21 years in business
Based in
Maynard, MA · Greater Boston
  • Protection & dust control
  • Full tear-out to the studs
  • Rough plumbing
  • Electrical & ventilation
  • Waterproofing & flood test
  • Tile, niche & grout
  • Vanity, toilet & fixtures
  • Glass, punch list & walk-through

The argument

Mostbathroomjobsgowronginthetwodaysnobodyphotographs:theroughplumbingandthewaterproofing.That'swherewespendourattention.

Scope of work

What a 7 Days bathroom actually includes

This is the scope sheet we hand you at the estimate — the same list, in the same order, that the crew works from. Nothing on it is a line item we add later.

Sheet

Scope of work

08 items · rev. 2026

Protection & dust control

Floor and stair protection from the door to the bathroom, a zippered dust wall at the opening, and debris carried out the same day it comes off the wall.

Day 1

Full tear-out to the studs

Tile, board, tub, vanity, toilet and the old subfloor if it's soft. We look at the joists and the supply lines while the walls are open and tell you what we find.

Day 1

Rough plumbing

Drain and supply relocated for the new layout, shower valve set to the tile plane, shutoffs replaced, and the whole thing pressure-checked before anything closes up.

Day 2

Electrical & ventilation

GFCI outlets, vanity and shower lighting, and an exhaust fan ducted to the outside — not into the joist bay or the attic, which is how ceilings grow mold.

Day 2

Waterproofing & flood test

Sloped mortar bed, bonded waterproofing membrane at the pan, curb and wall, corners banded, and a 24-hour flood test on the pan before a single tile goes down.

Day 3

Tile, niche & grout

Layout dry-run so cuts land where you'd want them, recessed niche framed and pitched, then grout and a sealed perimeter in silicone — never grout — at every change of plane.

Day 4–5

Vanity, toilet & fixtures

Vanity set and scribed to the wall, top and bowl, trim kits, toilet on a new flange and wax, mirror, lights and hardware.

Day 6

Glass, punch list & walk-through

Shower glass measured on site, then installed when the fabricator delivers. We walk the room with you and fix the punch list before the final invoice.

Day 7
Not includedAsbestos abatementDe-leadingStructural engineering stamps— we’ll point you to a licensed specialist.

The sequence

Seven working days, in order

A bathroom is a real sequence — nothing in it can be done out of order, which is exactly why a crew that leaves mid-job costs you weeks. Here is how ours runs.

Shower glass is templated on site and installed as soon as the fabricator delivers, which is usually the week after the tile is grouted. We tell you that up front rather than at the end.

  1. 00

    Estimate on site

    Thirty minutes in your bathroom, Monday to Saturday between 3 and 5 PM. You get a written, itemized proposal within 48 hours — not a number over the phone.

  2. 01

    Protection and demo

    Dust wall up, room stripped to the studs, debris out the same day. This is also when surprises surface, and when we tell you about them.

  3. 02

    Rough plumbing and electrical

    New drain and supply, valve set, GFCI and lighting, fan ducted outside. Permits pulled with your town and inspections scheduled by us.

  4. 03

    Waterproofing

    Mortar bed, membrane, banded corners, flood test. This is the day that decides whether the ceiling below stays dry for twenty years.

  5. 04

    Tile and grout

    Dry layout first so the cuts are deliberate. Then wall, floor, niche, grout, and silicone at every corner and change of plane.

  6. 05

    Vanity, fixtures and trim

    Everything you actually touch goes in: vanity, top, faucet, toilet, mirror, lighting, hardware, door and trim.

  7. 06

    Walk-through and sign-off

    We walk the room with you, write the punch list, finish it, and clean the space before we invoice.

Tiled shower wall with a rain head over herringbone marble

The day that matters

Waterproofing is the whole job.

A shower is a box that holds water for twenty years. Tile does not do that — tile is the finish. What keeps water out of your joists is a sloped mortar bed, a bonded membrane carried up the walls and over the curb, and banded corners at every change of plane.

We flood-test the pan for a full 24 hours before a single tile goes down. If it holds, we tile. If it doesn't, we find out on our time instead of on your ceiling.

It is the least photogenic day of the job and the only one that decides whether you call anybody about this bathroom again.

Sloped mortar bed
Pitched to the drain before anything waterproof goes on.
Bonded membrane
Pan, curb and walls, with corners banded rather than caulked.
24-hour flood test
Plugged, filled, marked and checked the next day.
Silicone, not grout
Every inside corner and change of plane stays flexible so it doesn't crack open in year two.

Why 7 Days

Four things that decide how a bathroom job goes.

01

Our crew, not a subcontractor lottery

The same certified people who demo your bathroom are the ones who tile it. You are not waiting on a tile guy who answers to somebody else's schedule.

02

We start and we finish

Twenty-one years and the promise hasn't changed: no abandoned jobs. We only commit to dates we can hold, then we hold them.

03

One bathroom, one household

If it's your only full bath, we plan the sequence around that — the toilet goes back in as early as the work allows, and we tell you which nights are the hard ones.

04

You see it every day

Photos and progress every working day, so the first time you see the tile layout isn't the day it's permanent.

The work

Bathrooms we build.

Walk-in showers, tub-to-shower conversions, primary suites and small second-floor baths — the range we work in across Greater Boston.

Marble walk-in shower next to a freestanding tub with a walnut vanityFig. 01
Tiled shower with a rain head and a herringbone marble wallFig. 02
Marble bathroom with a double vanity, brass faucets and oval mirrorsFig. 03
Curbless walk-in shower in large-format grey tile with black fixturesFig. 04
White bathroom with a glass shower enclosure and a wood-floor vanity wallFig. 05
Grey tiled bathroom with a soaking tub, wood vanity and towel warmerFig. 06
Freestanding tub against a wood slat wall in a dark-ceilinged bathroomFig. 07
Floating vanity with twin vessel sinks under a wide mirrorFig. 08

Reference builds in the configurations and materials we work in. Photography of 7 Days projects is added here as jobs are completed and released by the homeowner.

What clients say

Verified reviews,on Angi.

Verified reviews from the 7 Days profile on Angi, including the bathroom tile and flooring work.

4.8

4 reviews

on Angi

I hired 7 Days Remodel & Contracting to replace my deck and repair the front porch. I also needed new kitchen and bathroom flooring and tile on the kitchen counter and upstairs bathroom. Al and his team were extremely professional and multitasked to complete interior and exterior while I was away on military orders. Pleasantly surprised and extremely satisfied with the outcome and highly recommend them — Al communicated consistently throughout the process and completed the work as discussed prior to my return and on budget.
Jake D.Build or Replace a Deck or Non-Masonry PorchAngi · Sep 22, 2025
Al did a great job on our renovation of our three-unit apartment building. He showed up, his team showed up, and everyone was skilled, delivering a great result.

R.S.S.

Angi · Oct 7, 2025

They start and finish the work and I'm happy.

Jim B.

Angi · Sep 12, 2025

The job was done in a timeframe that was shorter than projected. Their team was very professional and did a great job cleaning up behind themselves.

Gregory H.

Angi · Aug 16, 2025

Genuine, verified customer reviews from the 7 Days profile on Angi. Names are shown exactly as Angi publishes them.

Straight answers

What people ask before they book.

How long does a bathroom remodel take?

A standard full bath runs about seven working days on site, plus the shower glass, which is templated after the tile is grouted and installed when the fabricator delivers. Layout changes, custom tile patterns and long-lead vanities push that out — and we put the real number in your written proposal instead of the optimistic one.

Can we still use the bathroom while you work?

Not the one we're building. If it's your only full bath, tell us at the estimate — we sequence the toilet back in as early as the work allows and we'll tell you honestly which nights you'll want a plan B.

Do you pull the permits?

Yes. Plumbing and electrical permits are pulled with your town's building department and we schedule the inspections. You don't chase paperwork.

What does a bathroom remodel cost?

It depends on the size of the room, whether the layout moves, and what you pick for tile, vanity, fixtures and glass. We don't quote bathrooms over the phone. The on-site estimate is free, takes about thirty minutes, and produces a written itemized price within 48 hours.

Can you convert a tub into a walk-in shower?

Yes, and it's one of the most common jobs we do in older Greater Boston homes. It usually means a new pan and drain location, a proper sloped mortar bed and membrane, and a decision about whether to keep a curb or go curbless — which depends on your joists. We look at that at the estimate.

Do you do small bathrooms and powder rooms?

Yes. A 5×7 second-floor bath in a 1920s two-family is our bread and butter, and a powder room is a short job we're happy to schedule.

What about asbestos or lead paint?

We don't do asbestos abatement or de-leading — those need a licensed specialist and we'll refer you to one. If we find something behind the wall during demo, we stop, tell you, and don't disturb it.

Who is actually in my house?

Our own vetted, certified crew. Same faces from demo day to the final walk-through, and you have Alessandro's number the entire time.

Free on-site estimate

Book the free on-site estimate

Thirty minutes in your bathroom, Monday to Saturday between 3 and 5 PM. Written itemized proposal within 48 hours. No pressure, no phone quotes.

+1 (508) 734-4894
Estimate window
Mon–Sat · 3:00 PM – 5:00 PM
On site
About 30 minutes
Written price
Within 48 hours

Tell us about the room

Two fields are required. The rest just makes the estimate faster.

Or call or text +1 (508) 734-4894 — we answer.