Kitchen remodeling · Greater Boston
- On-site estimate00
- Selections and orders01
- Delivery confirmed, demo scheduled02
- Demo, framing, rough trades03
- Close-up, floor, cabinets04
- Countertop template and install05
- Backsplash, trim, appliances, walk-through06
The kitchen comes out once.It goes back in on schedule.
Cabinets, countertops, backsplash, lighting, appliances and the plumbing and electrical behind them — designed, demoed and installed in one run by one crew. We don't open a wall until the cabinets have a delivery date.
- Estimate
- Ordered before demo
- Written price
- Written price in 48 hours
- Track record
- 21 years in business
- Based in
- Maynard, MA · Greater Boston
- Layout and measure
- Ordering and lead times
- Demo and haul-out
- Framing and layout changes
- Plumbing and electrical rough
- Cabinet installation
- Countertop template and install
- Backsplash, trim and finish
The argument
Kitchensdon'tstallbecauseofthecarpentry.TheystallbecausesomeonedemoedinMarchandthecabinetsshippedinJune.
The lead-time problem
We don't open a kitchen against a hope.
The longest thing in a kitchen remodel is not the work. It's the cabinets, and after them the countertop, which can only be templated once the boxes are actually installed and level.
So we build the calendar backwards. Selections get made, cabinets and tops get ordered, and only when there's a confirmed delivery date do we set the demo date against it. You keep cooking right up until the week we have something to install.
It sounds obvious. It is also the single reason most kitchen jobs run weeks over — somebody demoed first and started waiting second.
- Orders confirmed first
- Cabinets, tops and appliances with real delivery dates.
- Demo scheduled backwards
- From the delivery date, not from whenever we're free.
- Template after install
- Countertops are measured on the installed cabinets — the only way they fit the first time.
Scope of work
What we handle in a kitchen
One contract, one crew, one schedule. Everything below is run by our own people — you are not coordinating four trades against each other.
Sheet
Scope of work
08 items · rev. 2026
Layout and measure
Field measure of the real room, not the plan. We mark where appliances, outlets and the sink actually land before anything is ordered.
Ordering and lead times
Cabinets, tops and appliances get ordered and confirmed first. Demo is scheduled backwards from the delivery date so your kitchen isn't a construction site waiting on a truck.
Demo and haul-out
Old cabinets, tops, flooring and backsplash out, protected route to the door, debris gone the same day.
Framing and layout changes
Opening a wall, moving a doorway, building an island base or furring a wall for a new run — with the load path checked before anything is cut.
Plumbing and electrical rough
Sink and dishwasher supply and drain relocated, disposal, ice maker line, dedicated appliance circuits, under-cabinet and island outlets, range hood ducted outside.
Cabinet installation
Base and wall cabinets set level to a laser line, shimmed and scribed to a floor and wall that are never square, and screwed into blocking rather than drywall.
Countertop template and install
Templated on top of the installed cabinets — the only way it fits — then fabricated, delivered and seamed with the sink cut and mounted.
Backsplash, trim and finish
Tile and grout, crown and light rail, toe kick, filler panels, hardware, paint touch-up, appliance hook-up and a punch-list walk-through.
The schedule
How the schedule is built
The order matters and the waiting matters. Here's the honest version of a kitchen timeline.
The temporary-kitchen conversation happens at the estimate, not on demo day. We'll tell you which weeks you'll be living off a microwave and a coffee maker.
- 00
On-site estimate
Thirty minutes in your kitchen, Monday to Saturday, 3 to 5 PM. Written itemized proposal within 48 hours.
- 01
Selections and orders
Cabinets, tops, tile, fixtures and appliances chosen and ordered. Nothing gets demolished during this phase — you keep cooking.
- 02
Delivery confirmed, demo scheduled
Once the cabinet delivery date is real, we set the demo date against it and give you the full working calendar.
- 03
Demo, framing, rough trades
Tear-out, any layout change, plumbing and electrical rough, permits and inspections with your town.
- 04
Close-up, floor, cabinets
Board, tape, prime, flooring where it runs under the cabinets, then cabinets set and levelled.
- 05
Countertop template and install
Templated on the installed boxes. Fabrication is the one gap we can't compress, and we tell you how long it is before you sign.
- 06
Backsplash, trim, appliances, walk-through
Tile, grout, trim, hardware, appliances connected, punch list closed, kitchen cleaned and handed back.
Why 7 Days
Three things that keep a kitchen on schedule.
Ordered before opened
We don't demo a kitchen against a hope. Cabinets and tops are confirmed first, then the calendar gets written.
One crew across every trade
Carpentry, plumbing, electrical and tile under one schedule, so no trade is waiting on another company's dispatcher.
Level to a line, not to the floor
Old Greater Boston houses are not square. Cabinets get set to a laser line and scribed — which is why the countertop fits the first time.
The work
Kitchens we build.
Shaker and slab, islands and galleys, layout changes and straight swaps — across Greater Boston housing stock that is rarely square.
Reference builds in the configurations and materials we work in. Photography of 7 Days projects is added here as jobs are completed and released by the homeowner.
What clients say
Verified reviews,on Angi.
Verified reviews from the 7 Days profile on Angi, including kitchen flooring and counter tile work.
4.8
4 reviews
on Angi
“I hired 7 Days Remodel & Contracting to replace my deck and repair the front porch. I also needed new kitchen and bathroom flooring and tile on the kitchen counter and upstairs bathroom. Al and his team were extremely professional and multitasked to complete interior and exterior while I was away on military orders. Pleasantly surprised and extremely satisfied with the outcome and highly recommend them — Al communicated consistently throughout the process and completed the work as discussed prior to my return and on budget.”
“Al did a great job on our renovation of our three-unit apartment building. He showed up, his team showed up, and everyone was skilled, delivering a great result.”
R.S.S.
Angi · Oct 7, 2025
“They start and finish the work and I'm happy.”
Jim B.
Angi · Sep 12, 2025
“The job was done in a timeframe that was shorter than projected. Their team was very professional and did a great job cleaning up behind themselves.”
Gregory H.
Angi · Aug 16, 2025
Genuine, verified customer reviews from the 7 Days profile on Angi. Names are shown exactly as Angi publishes them.
Straight answers
What people ask about kitchens.
How long will I be without a kitchen?
For a straightforward kitchen with no layout change, plan on roughly three to five weeks on site — plus the countertop fabrication gap between template and install. We give you the real calendar in the written proposal.
Can you move the sink, or take out a wall?
Usually yes. Moving a sink means new drain and supply, and taking out a wall means checking whether it's carrying load and how the ceiling above is framed. We look at both at the estimate before anyone promises an open floor plan.
Do you supply the cabinets and countertops, or do I?
Either works. If we supply them, they're ordered on our timeline and we own the delivery date. If you supply them, we build the schedule around your delivery and we'll tell you what we need and when.
Do you pull permits?
Yes, for the plumbing and electrical work, with your town's building department. We schedule the inspections too.
What does a kitchen remodel cost?
Cabinets and countertops drive the number, and both are choices you make. That's why we don't quote kitchens over the phone — the free on-site estimate produces a written itemized price within 48 hours.
Can you keep the kitchen usable during the work?
Partly. There's a stretch — from demo through cabinet install — where the room is out of service. We plan the temporary setup with you before demo day rather than after it.
Beyond the bathroom
Other trades, same shop
Each of these runs with its own partner and its own crew.
- 01
Bathroom Remodeling
Most bathroom jobs go wrong in the two days nobody photographs: the rough plumbing and the waterproofing. That's where we spend our attention.
- 02
Interior & Exterior Painting
A paint job fails at the caulk line and the bare spot behind the radiator — never in the middle of the wall.
- 03
Home Remodeling
The reason crews walk off a remodel is that they promised a date they never had. We only commit to schedules we can hold.
Free on-site estimate
Book a free kitchen estimate
Thirty minutes in your kitchen, Monday to Saturday between 3 and 5 PM. Written itemized proposal within 48 hours.
- Estimate window
- Mon–Sat · 3:00 PM – 5:00 PM
- On site
- About 30 minutes
- Written price
- Within 48 hours