Kitchen remodeling · Greater Boston

The kitchen comes out once.It goes back in on schedule.

Cabinets, countertops, backsplash, lighting, appliances and the plumbing and electrical behind them — designed, demoed and installed in one run by one crew. We don't open a wall until the cabinets have a delivery date.

(508) 734-4894
Estimate
Ordered before demo
Written price
Written price in 48 hours
Track record
21 years in business
Based in
Maynard, MA · Greater Boston
  • Layout and measure
  • Ordering and lead times
  • Demo and haul-out
  • Framing and layout changes
  • Plumbing and electrical rough
  • Cabinet installation
  • Countertop template and install
  • Backsplash, trim and finish

The argument

Kitchensdon'tstallbecauseofthecarpentry.TheystallbecausesomeonedemoedinMarchandthecabinetsshippedinJune.

Grey shaker kitchen with a stone island and tile flooring

The lead-time problem

We don't open a kitchen against a hope.

The longest thing in a kitchen remodel is not the work. It's the cabinets, and after them the countertop, which can only be templated once the boxes are actually installed and level.

So we build the calendar backwards. Selections get made, cabinets and tops get ordered, and only when there's a confirmed delivery date do we set the demo date against it. You keep cooking right up until the week we have something to install.

It sounds obvious. It is also the single reason most kitchen jobs run weeks over — somebody demoed first and started waiting second.

Orders confirmed first
Cabinets, tops and appliances with real delivery dates.
Demo scheduled backwards
From the delivery date, not from whenever we're free.
Template after install
Countertops are measured on the installed cabinets — the only way they fit the first time.

Scope of work

What we handle in a kitchen

One contract, one crew, one schedule. Everything below is run by our own people — you are not coordinating four trades against each other.

Sheet

Scope of work

08 items · rev. 2026

Layout and measure

Field measure of the real room, not the plan. We mark where appliances, outlets and the sink actually land before anything is ordered.

Pre-order

Ordering and lead times

Cabinets, tops and appliances get ordered and confirmed first. Demo is scheduled backwards from the delivery date so your kitchen isn't a construction site waiting on a truck.

Pre-order

Demo and haul-out

Old cabinets, tops, flooring and backsplash out, protected route to the door, debris gone the same day.

Build

Framing and layout changes

Opening a wall, moving a doorway, building an island base or furring a wall for a new run — with the load path checked before anything is cut.

Build

Plumbing and electrical rough

Sink and dishwasher supply and drain relocated, disposal, ice maker line, dedicated appliance circuits, under-cabinet and island outlets, range hood ducted outside.

Build

Cabinet installation

Base and wall cabinets set level to a laser line, shimmed and scribed to a floor and wall that are never square, and screwed into blocking rather than drywall.

Install

Countertop template and install

Templated on top of the installed cabinets — the only way it fits — then fabricated, delivered and seamed with the sink cut and mounted.

Install

Backsplash, trim and finish

Tile and grout, crown and light rail, toe kick, filler panels, hardware, paint touch-up, appliance hook-up and a punch-list walk-through.

Finish
Not includedAsbestos abatementDe-leadingAppliance warranty service— we’ll point you to a licensed specialist.

The schedule

How the schedule is built

The order matters and the waiting matters. Here's the honest version of a kitchen timeline.

The temporary-kitchen conversation happens at the estimate, not on demo day. We'll tell you which weeks you'll be living off a microwave and a coffee maker.

  1. 00

    On-site estimate

    Thirty minutes in your kitchen, Monday to Saturday, 3 to 5 PM. Written itemized proposal within 48 hours.

  2. 01

    Selections and orders

    Cabinets, tops, tile, fixtures and appliances chosen and ordered. Nothing gets demolished during this phase — you keep cooking.

  3. 02

    Delivery confirmed, demo scheduled

    Once the cabinet delivery date is real, we set the demo date against it and give you the full working calendar.

  4. 03

    Demo, framing, rough trades

    Tear-out, any layout change, plumbing and electrical rough, permits and inspections with your town.

  5. 04

    Close-up, floor, cabinets

    Board, tape, prime, flooring where it runs under the cabinets, then cabinets set and levelled.

  6. 05

    Countertop template and install

    Templated on the installed boxes. Fabrication is the one gap we can't compress, and we tell you how long it is before you sign.

  7. 06

    Backsplash, trim, appliances, walk-through

    Tile, grout, trim, hardware, appliances connected, punch list closed, kitchen cleaned and handed back.

Why 7 Days

Three things that keep a kitchen on schedule.

01

Ordered before opened

We don't demo a kitchen against a hope. Cabinets and tops are confirmed first, then the calendar gets written.

02

One crew across every trade

Carpentry, plumbing, electrical and tile under one schedule, so no trade is waiting on another company's dispatcher.

03

Level to a line, not to the floor

Old Greater Boston houses are not square. Cabinets get set to a laser line and scribed — which is why the countertop fits the first time.

The work

Kitchens we build.

Shaker and slab, islands and galleys, layout changes and straight swaps — across Greater Boston housing stock that is rarely square.

White shaker kitchen with stainless appliances and a window over the sinkFig. 01
Modern kitchen with black cabinetry and a white stone counterFig. 02
Grey shaker kitchen with a marble-look island and tile floorFig. 03
Kitchen with a waterfall marble counter and pendant lightingFig. 04
Open kitchen with a centre island and bar stools under warm pendantsFig. 05
Bright white kitchen with a long island and glass pendant lightsFig. 06

Reference builds in the configurations and materials we work in. Photography of 7 Days projects is added here as jobs are completed and released by the homeowner.

What clients say

Verified reviews,on Angi.

Verified reviews from the 7 Days profile on Angi, including kitchen flooring and counter tile work.

4.8

4 reviews

on Angi

I hired 7 Days Remodel & Contracting to replace my deck and repair the front porch. I also needed new kitchen and bathroom flooring and tile on the kitchen counter and upstairs bathroom. Al and his team were extremely professional and multitasked to complete interior and exterior while I was away on military orders. Pleasantly surprised and extremely satisfied with the outcome and highly recommend them — Al communicated consistently throughout the process and completed the work as discussed prior to my return and on budget.
Jake D.Build or Replace a Deck or Non-Masonry PorchAngi · Sep 22, 2025
Al did a great job on our renovation of our three-unit apartment building. He showed up, his team showed up, and everyone was skilled, delivering a great result.

R.S.S.

Angi · Oct 7, 2025

They start and finish the work and I'm happy.

Jim B.

Angi · Sep 12, 2025

The job was done in a timeframe that was shorter than projected. Their team was very professional and did a great job cleaning up behind themselves.

Gregory H.

Angi · Aug 16, 2025

Genuine, verified customer reviews from the 7 Days profile on Angi. Names are shown exactly as Angi publishes them.

Straight answers

What people ask about kitchens.

How long will I be without a kitchen?

For a straightforward kitchen with no layout change, plan on roughly three to five weeks on site — plus the countertop fabrication gap between template and install. We give you the real calendar in the written proposal.

Can you move the sink, or take out a wall?

Usually yes. Moving a sink means new drain and supply, and taking out a wall means checking whether it's carrying load and how the ceiling above is framed. We look at both at the estimate before anyone promises an open floor plan.

Do you supply the cabinets and countertops, or do I?

Either works. If we supply them, they're ordered on our timeline and we own the delivery date. If you supply them, we build the schedule around your delivery and we'll tell you what we need and when.

Do you pull permits?

Yes, for the plumbing and electrical work, with your town's building department. We schedule the inspections too.

What does a kitchen remodel cost?

Cabinets and countertops drive the number, and both are choices you make. That's why we don't quote kitchens over the phone — the free on-site estimate produces a written itemized price within 48 hours.

Can you keep the kitchen usable during the work?

Partly. There's a stretch — from demo through cabinet install — where the room is out of service. We plan the temporary setup with you before demo day rather than after it.

Free on-site estimate

Book a free kitchen estimate

Thirty minutes in your kitchen, Monday to Saturday between 3 and 5 PM. Written itemized proposal within 48 hours.

+1 (508) 734-4894
Estimate window
Mon–Sat · 3:00 PM – 5:00 PM
On site
About 30 minutes
Written price
Within 48 hours

Tell us about the room

Two fields are required. The rest just makes the estimate faster.

Or call or text +1 (508) 734-4894 — we answer.